Sl. No
|
Client
|
Work Order No;
|
Date
|
Scope of Work
|
Status
|
|
|
Power
|
|
1
|
The Dhampur Sugar Mills Limited,
Okhla Industrial Estate,
New Delhi – 110 020
|
DSM/R/PUR/2005/4624
|
12.10.2005
|
Piping Engineering Consultancy including Stress Engineering, Site survey, for 30 MW Turbine Piping at Rauzagaon unit, Lucknow
|
Completed
|
|
DSM/R/PUR/ Asmoli WOA 26
|
08.09.2006
|
Piping Engineering Consultancy including Stress Engineering, for 10 MW Power Piping at Asmoli Unit, Uttar Pradesh
|
Completed
|
|
DSM/R/PUR/ Rajpura WOR 1046
|
21.09.2006
|
Piping Engineering Consultancy including Stress Engineering, for 120 TPH Boiler and 12 MW Turbine at Rajpura unit
|
Completed
|
|
DSM/R/PUR/Mansoorpur WOM 119
|
15.11.2006
|
Piping Engineering Consultancy including Stress Engineering, for 70 TPH Boiler and 27.7 MW Turbine at Mansoorpur unit
|
Completed
|
|
1536/988 (DSM – M)
|
07.05.2010
|
Steam Line Engineering for 110 TPH Boiler to Header for DSM Mansoorpur
|
Completed
|
|
2
|
DSCL Energy Service Limited,
18, Barakhamba Road,
New Delhi – 110 001
|
DSCL
|
28.03.2007
|
Engineering Consultancy for Steam, FW & CW Piping for 30 MW Biomass Fired Co-Gen Power Project at Dhanaura, UP; of M/s. Chadha Sugars Limited
|
Completed
|
|
DSCL
|
12.07.2007
|
Engineering Consultancy for Steam Piping for 48 MW Coal fired Power Project at Jhagadia, Bharuch, Gujarat of M/s. Shriram Alkali & Chemicals Limited
|
Completed
|
|
3
|
Sugar Technology International,
Texas, USA
|
|
April 2008
|
Piping Engineering Consultancy for Stress Engineering of 210 TPH Boiler & 26 MW TG of Sugar Technology’s Sugar Plant at Bolivia, Latin America
|
Completed
|
|
4
|
Lanco Infratech Limited
Gurgaon, NCR
|
4400006695
|
13.04.2010
|
15000 M3 Floating Roof Tank for Naphtha Storage & 575 M3 Fixed Roof HSD Tank Design & Detail Engineering
|
Completed
|
|
4400024695
|
05.10.2011
|
Aux. Steam Line Engineering, Vidharba 2x660 MW TPP
|
On going
|
|
4400026791
|
13.12.2011
|
Aux.Steam Line Engineering, Babandh, 2x660 MW TPP
|
On going
|
|
|
Consilience Engineering Pvt. Ltd, Pune
|
AIT//PO/MAD/AGPS/1822/WO01/170910
|
17.09.2010
|
Filter House Walk way design for NTPC Anta Power Plant
|
Completed
|
|
20101/WO/MPEC/009/300311
|
30.03.2011
|
Louvers & Vibration Analysis on Filter House of NTPC Anta Power Plant
|
Completed
|
|
20101/WO/MPEC/010/300311
|
30.03.2011
|
Skid foundation Design for NTPC Anta Power Plant
|
Completed
|
|
20101/WO/MPEC/011/300311
|
30.03.2011
|
Backside Walkway Design for Filter House of NTPC Anta Power Plant
|
Completed
|
|
6
|
Indian Institute of Technology Bombay,
|
09MNRE001/Work Order–Consultants
|
12.11.2010
|
1 MW Solar Thermal Power Plant
|
On going
|
|
Oil & Gas, Offshore
|
|
1
|
Technip K T India ,
Technip Tower,
Sector 1,
Noida 201 301, NCR
|
KB/rcm/715-2476
|
15.09.2006
|
Pipe Support Engineering and Detail for ONGC’s 26 well head platforms
|
Completed
|
|
KB/rcm/723-2539
|
21.05.2007
|
Pipe Support Engineering and Detail for ONGC’s 13 well head platforms
|
Completed
|
|
2
|
Indian Oil Corporation,
R & D Centre,
Faridabad – 121 007, NCR
|
R & D/PJ/2005-06/WO No/ 01/A
|
04.04.2005
|
Engineering Consultancy for Preparation of Technical Tender Documentation (LSTK) for Demonstration Plant for 25.kg Poly Packaging of Paving Grade Bitumen at IOCL, Panipat Refinery,
|
Completed
|
|
3
|
Nagarjuna Construction Limited at Auraiya , UP
|
REPL/MFE /PJ–01
|
21 .11.2005
|
Preparation of Isometrics for OWS under ground piping of ONGC at Gail Auraiya, UP
|
Completed
|
|
4
|
Punj Lloyd limited,
Okhla Industrial Esatate, New Delhi – 110 020
|
CORPHO/115569
|
05.09.2005
|
Piping Design and Detail Engineering for bulk liquid product terminal at Jurung Island, Singapore.
|
Completed
|
|
UTPL/SKK/12/001
|
13.09.2005
|
Drafting & Detailing of Design Drawings of Structural Steel and Fabrication Drawing for Uran-Trombay Pipeline Project
|
Completed
|
|
CRPHO/11753
|
10.10.2006
|
Drafting of Process Flow Diagrams and P & IDs based on inputs for Tank Store Terminal Project at Singapore
|
Completed
|
|
5
|
Petron Civil Eng. Pvt Ltd,
Bhatinda Refinery Site
|
HBP/CC-348/WO/091/09
|
10.11.2009
|
Underground Piping Isis for different units
|
Completed
|
|
6
|
Simon Engineering & Partners LLC, Muscat, Sultanate of Oman
|
SEP/1019/10/01
|
21.04.2010
|
Deputation for On-shore Tankage area Piping revamp project
|
Completed
|
|
7
|
Lurgi India Company Pvt Ltd,
|
LND:10187 A: MPEC:WO:11:00
|
10.02.2011
|
Preparation of Fabrication Drawings of Storage Tank for SRU Project at IOCL, Paradeep Refinery
|
On going
|
|
Steel & Metal
|
|
1
|
Monnet Ispat & Energy Limited,
Masjid Moth,
New Delhi – 110 048
|
MIL/HO/PRJ/3/Raig/19618/2006/WO-196
|
23.01.2006
|
Engineering Consultancy for Design and Detail Engineering in Piping for 2x100 TPD Kilns of Sponge Iron Plant at Raigarh, Chattisgarh.
|
Completed
|
|
MIL/HO/PRJ-3/Raig/1961B/2006/100-285/2713
|
07.04.2006
|
Engineering Consultancy for Design and Detail Engineering in Piping for 2x350 TPD Kilns of Sponge Iron Plant at Raigarh, Chattisgarh
|
Completed
|
|
MIL/HO/PRJ/2002/2007/PO-HO- 0150/12243
|
15.03.2007
|
Engineering Consultancy for Design and Engineering of PGP Gas burner distribution pipe line for Re heating furnace for Producer Gas Plant at Raipur, Chattisgarh.
|
Completed
|
|
MIEL/HO/PRJ-3/4055/BF&SP/WOH11-00061
|
13.09.2011
|
Consultancy for Utility Piping detail Engineering for Blast Furnace and Sinter Plant Project at Naharpali, Raigarh, Chhattisgarh.
|
On going
|
|
2
|
Met Trade India Limited, Ghazipur,
Delhi – 100 096
|
PUR/SUR/08-09/13
|
05.03.2009
|
Process & Piping Engineering Consultancy for Aluminum Melting & Stripping Plant
|
Completed
|
|
3
|
Sherman Metal Technologies(P) Limited
|
SMTPL/MPEC/JSL/012
|
19-11-2010
|
4 Hi REV. Cold Mill Piping Consultancy
|
Completed
|
|
Paper & Pulp
|
|
1
|
Chemprojects Consulting Pvt. Limited,
Okhla Industrial Estate, Phase- 1,
New Delhi - 110020
|
Chem/S/05
Chem/S/1335
|
10.01.2005
13.01.2006
|
Consultancy Services for Detail Engineering for Off Site and Paper & Pulp Mill area Piping for 5000 TPY Kenaf Pulp Mill Project of Myanmar Jute Industries at Myanmar.
|
Completed
|
|
Chem/S
|
16.05.2005
|
Engineering Consultancy for Detail Engineering of ODL plant and screening area of Central Pulp Mills of JK Paper at Surat.
|
Completed
|
|
Chem/S/1335
|
29.06.2006
|
Piping GADs, Details, MTO, Interface with other Utilities, Stress Analysis for Medium Pressure Steam lines, IBR Documentation,
|
Completed
|
|
Chem/S
|
11.07.2007
|
Piping Engineering Services for Chemical Recovery Unit of Pulp and Paper Project of Ruchira Paper at Himachal Pradesh.
|
Completed
|
|
Water Treatment Plants
|
|
1
|
Triveni Engineering & Industries Limited,
Noida – 201 301, NCR
|
KCA/PXD-536/D&E
|
30.08.2005
|
Piping Detail Engineering for RO plant of M/s. TEIL at Deoband Sugar Plant.
|
Completed
|
|
KCA/PXD-530/D&
|
30.10.2005
|
RO Plant Piping Detail Engineering for of 12 MW Captive Power Plant of CVPL at Thituchirapalli
|
Completed
|
|
KCA/PXD-537/ D&E
|
30.11.2005
|
Piping Detail Engineering for RO & WTP for 30 MW Captive Power Plant of Aryan Coal Beneficiations at Korba, Chattisgarh
|
Completed
|
|
KCA/ PXD-526/ D &E
|
30.01.2006
|
Piping Details Engineering for RO plant & WTP of 2x15 MW Co-Gen Power Plant of Indorama Petrochemicals at Nagpur
|
Completed
|
|
KCA/ PXD-554/ D&E
|
24.03.2006
|
Piping Details Engineering for 50 M3/hr DM and RO plant of KM Sugar Mills at Faizabad, U.P
|
Completed
|
|
KCA/ PXD-542A/D&E
|
30.03.2006
|
Piping Detail Engineering for 60 m3.hr DM plant of Bajaj Hindustan at Lakhimpur, U.P
|
Completed
|
|
KCA/ P x D-542B/D&E
|
30.03.2006
|
Piping Detail Engineering for 60m3.hr DM plant of M/s. Bajaj Hindustan Ltd., at Saharanpur, U.P
|
Completed
|
|
KCA/ P x D-567/D&E
|
24.04.2006
|
Piping Detail Engineering for Mixed Bed unit, DM water storage tank and interfacing with other’s scope of Maruti Udyog Limited, Manesar, Gurgaon.
|
Completed
|
|
KCA/ PXD-542C/D&E
|
25.04.2006
|
Piping Detail Engineering for 60 M3.hr DM plant of Bajaj Hindustan at Piliphit, U.P.
|
Completed
|
|
KCA/ PXD-562/D&E
|
22.09.2006
|
Piping Detail Engineering for Water Treatment Plant of Sitapuram Power Ltd.,
|
Completed
|
|
KCA/ PXD-604/D&E
|
30.04.2007
|
Piping Detail Engineering for Pre-Treatment Plant of Ms. Lanco Infratech Limited, Hyderabad
|
Completed
|
|
SK/PXD-645/08
|
22.06.2007
|
Civil Design and Engineering of WTP of M/s. Sukhbir Agro, at Jamshedpur
|
Completed
|
|
KCA/PXD-621/D&E
|
30.06.2007
|
Piping Detail Engineering for PT Plant of Visa Steel, at Orissa
|
Completed
|
|
KCA/PXD-680/D&E
|
14.02.2008
|
Civil Design for Orbal Disc for WTPs of TEIL Sugar Units
|
Completed
|
|
KCA/ PXD-677/WO/D&E
|
20.06.2008
|
Piping Detail Engineering for Pre-Treatment Plant of M/s. Jindal Power, Sitarganj, Uttar Pradesh
|
Completed
|
|
KCA/ PXD-677/W/D&E
|
30.06.2008
|
Piping Detail Engineering for Pre-Treatment Plant of 370 MW Gas Based Power Plant of M/s. Gujarat State Electricity Company Limited, at Utran, Gujarat for Alstom Power, Gurgaon
|
Completed
|
|
MKG/PXD-714/Mapcon/08-09/01
|
08.09.2009
|
Piping Detail Engineering for WTP (Pre- Treatment & RO) of 1x63 MW Power Plant of M/s. SV Power Pvt. Limited.
|
Completed
|
|
Fuel Oil Handling
|
|
1
|
Technofab Engineering Limited,
Faridabad – 121 003, NCR
|
3477/3298
5542
|
03.11.2007
26.02.2008
|
Piping Engineering Consultancy for Stress Engineering of Lanco Amarkantak Power Plant Steam & FO System
|
Completed
|
|
3483/ 5015
|
25.01.2008
|
Civil Engineering Consultancy for Fuel Oil Handling System of Lanco, Udupi 2x507.5 MW Power Plant at Karnataka
|
Completed
|
|
3490/ 2096
|
16.07.2008
|
Civil Engineering Consultancy for Fuel Oil Handling System of Lanco, Anpara for 2x600 MW Power Plant, U.P
|
Completed
|
|
3483/ 2095
|
16.07.2008
|
Piping Engineering Consultancy for Stress Engineering of for 2x507.5 MW Lanco Udupi Power Plant Steam & FO System at Karnataka
|
Completed
|
|
CHEMICALS & FERTILIZERS
|
|
1
|
Jubilant Organosys Limited, Bhartiyagram, Gajraula, Uttar Pradesh
|
306901
|
20.12.2004
|
Engineering Consultancy for Piping Detail Engineering of 20KL Autoclave Unit & Hot Oil Unit.
|
Completed
|
|
308885
|
20.08.2005
|
Preparation of Process P & IDs and Equipment Layout for Amino Unit
|
Completed
|
|
309053
|
24.09.2005
|
Engineering Consultancy in Piping, Civil/ Structural for 540 TPA, 2 Amino, 4 Methyl Pyridine Plant
|
Completed
|
|
309466
|
14.12.2005
|
Civil Engineering Consultancy for Fertilizer Unit, Ash Pond, Molasses Storage area, Fire Water Storage Tank, etc
|
Completed
|
|
2
|
HPL Additives ( Formerly : High Polymer Labs Limited), Faridabad, NCR
|
D05/083
Amendment HPLD/EXP/MISC/07/216
|
16.12.2006 07.11.2007
|
Engineering Consultancy for Detail Engineering for Pilot Plant at Dudhola, Faridabad.
|
Completed
|
|
3
|
Mil India limited,
Noida – 201 301,
NCR
|
MIN/ 286/Proj/002
MIN/286/Proj/003
|
07.04.2006
16.11.2006
|
Piping, Electrical and Instrumentation, Detail Engineering for M/s. PZ Cusson’s Continuous Vacuum and Soap Drying Plant at Tema, Ghana, Africa
|
Completed
|
|
4
|
Mott Mac Donald India, Noida – 201 301,
NCR
|
227979/2007/PIB/21
227979/2007/DIB/54
|
01.02.2007
02.07.2007
|
Piping Detail Engineering for Process ‘C’ unit of Otsuka Chemicals at Kotputli, Rajasthan.
|
Completed
|
|
5
|
Simon India Limited,
6 Nehru Place,
New Delhi – 110 019
|
SIL/C1069 /PPG- ISMRC/001/2004
|
06.12.2004
|
Preparation of Piping Isometrics, Support Marking for DCM Shriram Consolidatded at Kota, Rajasthan.
|
Completed
|
|
SIL/C1116 /P&IDs/003
SIL/MFL/C1116/Isometrics/009
SIL/MFL/C1116/Isometrics/010
|
23.01.2008
09.06.2008
05.09.2008
|
Piping Detail Engineering of Plant Pipe Rack of M/s. Meghmany FineChem Limited at Dahej, Gujarat.
|
Completed
|
|
SIL/DCL/C1112/Isometrics/009
SIL/C1112/Piping_GAD/10
|
09.06.2008
02.09.2008
|
Preparation of Piping Isometrics, Support Marking for Durgapur Chemicals at West Bengal.
|
Completed
|
|
SIL/C1115/Piping_Isomt/015
|
05.09.2008
|
Preparation of Piping Isometrics, Support Marking for Chemical Plant of Chemenol at Saudi Arabia
|
Completed
|
|
6
|
Continental Carbon India Limited,
Ghaziabad-201 001
|
11319
|
05.06.2007
|
Engineering Consultancy for Bag Filter House
|
Completed
|
|
11973
|
02.07.2008
|
Engineering Consultancy for 950 deg C APH Revamp
|
Completed
|
|
3090001092
|
10.03.2009
|
Engineering Consultancy for Steam Line Design & IBR Documentation
|
Completed
|
|
3100004228
|
22.06.2010
|
Engineering & Detail Engineering for Carbon Black Reactor & Quench Boiler and hook-up with Existing Plant
|
Completed
|
|
310004641
|
09.07.2010
|
Carbon Caking Plant at NFL, Panipat
|
Completed
|
|
3110004532
|
21.07.2011
|
Carbon Caking Plant Expansion at NFL, Panipat
|
On going
|
|
7
|
Indo Gulf Fertilizers, Jagdishpur Industrial Area, Sultanpur,
Uttar Pradesh – 227 817
|
MM/ 221-946628A/00
|
25.08.2008
|
Civil Engineering Consultancy for 3000 M3 DM Water Storage Tank
|
Completed
|
|
8
|
Vasn Engineering,
Green Park Extn,
New Delhi
|
Nil
|
September 2008
|
Mechanical Engineering Consultancy for 3000 M3 DM Water Storage Tank of Indo Gulf Fertilizers, Jagdishpur
|
Completed
|
|
Nil
|
April 2009
|
Mechanical Engineering Consultancy for 98% Sulphuric Acid Storage Tank Design as per API for Indo Gulf Fertilizers, Jagdishpur
|
Completed
|
|
9
|
Otsuka Chemical (India) Ltd
416, JMD Pacific Square,
Sector 15, Part-II
NH- 8, Gurgaon- 122 001
|
SMP/WO-002
|
25.08.2009
|
Piping Detail Engineering Consultancy for Process “S” Expansion at Kotputli, Rajasthan unit
|
Completed
|
|
CEP WO- 002
|
21.09.2010
|
Piping Detail Engineering Consultancy for Process” C & SR” Expansion at Kotputli,
|
Completed
|
|
BSR-WO-002
|
07.12.2011
|
Consultancy services for Piping & Structural Engineering for BS Recovery Project at Kotputli
|
On going
|
|
10
|
Birla Technical Services, New Delhi
|
|
October 2004
|
Preparation of Piping Isomerizes
|
Completed
|
|
11
|
Technip K T India ,
Technip Tower,
Sector 1,
Noida 201 301, NCR
|
KB/rcm/728A-2814
|
03 .11. 2008
|
Engineering Consultancy for CGMP. API Facilities for 236 TPA Pharmaceutical Demonstration Plant of M/s. Jubilant Organosys at Mysore
|
Completed
|
|
12
|
Dhampure Specialty Sugar, Dhampur (U.P)
|
E-mail
|
19.10.2011
|
Plant Upgradation
|
On Going
|
|
Other
|
|
1
|
Whirlpool, of India Limited, Faridabad – 121 001, NCR
|
WOIL/WOPM/11
|
16.02.2005
|
Conducted Study about pressure drop, Testing of existing fire hydrant system and suggestions to improve at Faridabad Unit.
|
Completed
|
|
2
|
Him Chem Limited,
Azadpur
Delhi – 110 033
|
HIM/DEL/PO/1034
|
28.04.2005
|
Engineering Consultancy for Preparation of Plant As built of Nalagarh Synthetic Filament unit
|
Completed
|
|
3
|
Petron Emirates Contracting & Mfg. Co (LLC),
Dubai
|
AB/C-462-2/272
|
04.07.2006
|
Deputation of Piping Draughtsman at Dubai
|
Completed
|
|
4
|
Woodlands,
GK-II,
New Delhi – 110 048
|
Mail
|
Sept. 2007
|
Design and detail Engineering of Oil Separator Skid, Design of Shipment Container Box.
|
Completed
|
|
5
|
Consilience Engineering Pvt. Ltd, Pune
|
30401/PO/MPEC/010/303011
|
30.03.2011
|
Foundation design for Temporary Structure for Kolkata Dock yard
|
Completed
|
|
30401/PO/MPEC/010/303011
|
30.03.2011
|
Site Plan, Lifting arrangement design and Lighting design for Temporary Structure for Kolkata Dock yard
|
Completed
|
|
30401/PO/MPEC/010/303011
|
30.03.2011
|
Service platform extension design for Kolkata Dock yard
|
Completed
|
|
30401/PO/MPEC/010/303011
|
30.03.2011
|
Storm anchor design for Kolkata Dock yard
|
Completed
|
|
30403/PO/MADATH/001/140511
|
14.05.2011
|
Design of Parking Foundation for Fabric structure on Dry Dock of Kolkata Dock yard
|
Completed
|
|
30403
|
|
Design of Rail Foundation for elevated mobile structure on GRSE Dry Dock of Kolkata Dock yard
|
On going
|
|
30402/ 30403/ 30501
|
|
Design of Electrical facilities for elevated mobile structure on GRSE Dry Dock of Kolkata Dock yard
|
On going
|
|